Owners · Developers · Builders · Fabricators

Steel structure and warehouse design in Hobart

Portal frames, warehouses, industrial sheds and workshops, designed from the frame down to the footings and slab, with wind loads worked out for your site. Drawings your fabricator and builder can price, and a Form 35 for your building surveyor.

Fixed quoteper project, before we start
1–2 hrsto a fixed quote
Tas licensedEngineer – Civil
Inside a steel portal-frame warehouse under construction: tall steel columns and rafters, purlins, a concrete slab and roller door openings

Documented for your surveyor

Drawings, calculations and a Form 35 your building surveyor can rely on.

Fixed quote in 1–2 business hours

Get a fixed quote for your steel building

Send the layout or concept drawings, the site address and the building's size and use.

Fixed quote for your job. No obligation. Or call 03 6146 4747

Photos or plans optional · up to 5 files · Max 50 MB each

Licensed in TasmaniaEngineer – Civil · [licence no.]
Engineer-signed[CPEng / NER] · [PI insurance]
Form 35 with every designDocumented for your building surveyor
Fixed fee per projectQuoted within 1–2 business hours

In short

Steel structure design in Hobart covers portal frames, sheds, warehouses and light industrial buildings: the frame, connections, bracing, footings and slab, with wind loads worked out for the actual site. Tasmania is in non-cyclonic wind Region A, but terrain, shielding and topography change the design wind from one site to the next. You receive calculations, drawings and a Form 35, priced by fixed quote.

Fee
Fixed quote per project
Quote
Within 1–2 business hours
You receive
Calculations, drawings and a Form 35

What we design

What steel structures do we design?

We design steel structures for commercial and light industrial use across Greater Hobart, from a single-bay workshop to a multi-bay warehouse, plus the steelwork inside mixed buildings. Whether you need a warehouse engineer, industrial shed engineering or portal frame design for a fabricator to price, the order is the same: the site first, then the frame, then the footings.

Portal frame warehouses

Rafters, columns, haunches and knee braces, purlins and girts, and the roof and wall bracing that holds it all square.

Industrial sheds and workshops

Sheds for storage, trades and vehicles, with large roller door openings designed for the wind pressure they let in.

Light industrial units

Multi-tenancy units with shared frames, internal walls and mezzanine offices. See mezzanine engineering.

Canopies and awnings

Cantilevered canopies, loading dock awnings and covered walkways, where uplift and connections govern the design.

Steel in mixed buildings

Transfer beams, steel posts and portal frames inside timber or masonry buildings, such as an open-plan ground floor.

Extensions and alterations

New bays, new openings and added loads on existing frames, checked against what the old frame can carry.

Wind loads

How are wind loads worked out for a Hobart steel building?

Wind loads for a steel building are worked out for the specific site under AS/NZS 1170.2, starting from Tasmania's non-cyclonic Region A. For a light steel building, wind usually governs the frame, the bracing and the footings, so the site factors below matter more than the steel grade.

FactorWhat it meansWhy it varies across Hobart
RegionThe regional wind speed from AS/NZS 1170.2Non-cyclonic Region A applies across Tasmania
Terrain categoryHow rough the ground is upwindOpen water on the Derwent or open paddocks give higher winds than built-up suburbs
ShieldingProtection from nearby buildingsInfill sites may be shielded; a building on its own or at an estate edge is not
TopographySpeed-up over hills, ridges and escarpmentsHobart's hills and steep slopes raise wind speeds on crests and upper slopes
Height and importanceThe building's height and its importance level under the NCCTaller buildings and higher importance levels take larger design loads
OpeningsInternal pressure through large openingsA roller door left open in a storm can pressurise the whole building from inside

This is why we never publish one wind class for Hobart: two sites in the same suburb can need different frames.

What about snow loads?

Snow loads are a design case for alpine sites. The NCC treats Tasmanian land more than 900 m above sea level (AHD) with likely significant snowfall as an alpine area. Most Greater Hobart sites sit well below that, so wind, not snow, usually governs the roof design. We check the elevation of every site, including higher ground on the slopes of kunanyi / Mount Wellington and sites in the Central Highlands.

Changing a building changes its wind loads

Adding a large roller door, removing wall cladding or extending the building changes the internal pressure and the bracing loads. Have the frame checked before the change, not after.

The design package

What's in a steel structure design package?

A steel structure design package gives the fabricator, the builder and the building surveyor everything they need to price, build and approve the frame. Your quote lists the items for your project.

  • General arrangement drawings with member sizes, grades and the column grid
  • Connection details: base plates, haunches, apex, purlin cleats and bracing
  • Roof and wall bracing layout, including fly bracing to rafters and columns
  • Pad footings and hold-down bolts designed for uplift and sideways loads
  • Slab thickness, joints and reinforcement for the floor loads and any vehicle traffic
  • Calculations to AS/NZS 1170 for loads and AS 4100 for structural steel
  • A Form 35 for the building surveyor's Certificate of Likely Compliance
  • Shop drawing review and stage inspections, where your quote includes them

Kit shed or custom design?

CompareKit shedCustom steel design
Frame designSupplier's standard design for a set of wind and size inputsDesigned for your building, site and use
Footings and slabSometimes standard, sometimes left to youDesigned from the site classification
ChangesExtra openings, mezzanines or cladding changes need checkingIncluded in the design from the start
Where we helpChecking the kit for your site and designing the footingsThe full design, Form 35 and inspections

Your building surveyor will tell you whether a kit's engineering is enough for your site or whether site-specific checks are also needed.

Ground and water

What else does a warehouse site need?

A warehouse site needs footings designed for the ground, stormwater designed for a large roof, and sometimes retaining or landslip work. These three often decide the cost as much as the steel does.

01

Footings on reactive clay

Clays weathered from dolerite are documented as expansive in Hobart. Footings and slabs are designed from a site classification or geotechnical investigation.

02

Stormwater from a big roof

Stormwater beyond a 290 m² roof catchment is notifiable plumbing work, designed by a licensed designer with a Form 35. Councils such as Hobart and Clarence also set on-site detention rules. See stormwater and drainage.

03

Water quality over 500 m²

Developments adding 500 m² or more of hard surface fall under the State Stormwater Strategy targets of 80% suspended solids, 45% phosphorus and 45% nitrogen reduction.

04

Cut, fill and slopes

A level pad on a sloping site often needs retaining walls, and a site in a landslip band can need a landslip hazard report first.

Planning a steel building?

Send the layout for a fixed quote

Concept drawings or a sketch with the size, use and address are enough. You'll have a fixed fee within 1–2 business hours.

FAQ

Steel structure and warehouse FAQs

Still unsure? Call 03 6146 4747 or send photos for a fixed quote.

What wind class is Hobart?
There is no single wind class for Hobart. Tasmania is in non-cyclonic wind Region A, and the design wind speed for each site depends on its terrain, shielding, topography and the building's height, so we work it out for your site.
Does a shed or warehouse need an engineer in Tasmania?
A new warehouse or commercial shed normally goes through a building surveyor, who asks for structural drawings, calculations and the designer's Form 35. Small outbuildings can fall into a low-risk category, and your building surveyor confirms which category applies.
Can you check a kit shed for my site?
Yes. We check the supplier's design against your site's wind loads, soil and any changes such as extra openings, a mezzanine or a different cladding, and design the footings and slab where the kit doesn't include them.
Do you design the slab and footings as well as the frame?
Yes. Pad footings and hold-down bolts are designed for the frame's uplift and sideways loads, and the slab for its floor loads, from a site classification or geotechnical investigation.
Do Hobart steel buildings need to be designed for snow?
Only alpine sites. The NCC treats Tasmanian land more than 900 m above sea level (AHD) with likely significant snowfall as alpine, so we check every site's elevation. For most Greater Hobart sites, wind governs the roof design.
Can you design an extension to an existing warehouse?
Yes. We check the existing frame where the new bays connect, because an extension can change the wind and bracing loads on the old building, then design the new frame, footings and connections.
How much does steel structure design cost?
Steel buildings are priced by fixed quote per project, based on size, the number of frame types, the site and the inspections needed. You'll have the fixed fee within 1–2 business hours of sending the layout.
Do you supply or build steel buildings?
No. We are engineering only. We design and certify the structure, and any fabricator and licensed builder can price and build it.

Ready when you are

Send a few photos. We'll send a fixed price.

Photos or plans are enough to quote. You'll have a fixed quote within 1–2 business hours, with whether the job needs a site visit and when you'll receive it.

Mon–Fri 8:00am–5:00pm · Prices from $350 + GST · Engineering only, independent advice

Call Get a fixed quote