Neighbours · Builders · Developers

Dilapidation reports in Hobart, before the digging starts

A dilapidation report records a building's condition before nearby excavation, demolition or construction, so new damage can be told apart from old. Ours are prepared and signed by a structural engineer, with dated photos and a measured crack register, and we have no stake in the building work.

From $650+ GST, fixed before we start
1–2 hrsto a fixed quote
Before & afteron the same measured points
Camera on a tripod and a clipboard beside a rendered house wall, with a neighbouring excavation and an excavator behind a fence

Independent record

Facts, photos and measurements, recorded the same way whoever engages us.

Fixed quote in 1–2 business hours

Get a fixed quote for a dilapidation report

Tell us the address, what work is planned next door and when it starts.

From $650 + GST. No obligation. Or call 03 6146 4747

Photos or plans optional · up to 5 files · Max 50 MB each

Licensed in TasmaniaEngineer – Civil · [licence no.]
Signed by a structural engineer[CPEng / NER]
Reports from $650 + GSTPrice fixed before we start
IndependentWe never sell or carry out repairs

In short

A dilapidation report in Hobart starts from $650 + GST. A structural engineer records a building's condition before nearby excavation, demolition or construction, with dated photos and a measured crack register, then repeats the check on the same points once the work ends. It gives the neighbour and the builder one shared record. If the work needs protection work next door, Tasmania requires a building surveyor.

Fee
From $650 + GST for a typical house
You receive
Signed report, photo log and a measured crack register
When
Before work starts, and again when it ends

Overview

What is a dilapidation report?

A dilapidation report is a dated, signed record of a building's condition before nearby work starts. It is also called a pre-construction condition report. The engineer photographs and measures the cracks and defects already there, inside and out, so that anything new after the work can be identified.

Without a record, a crack found after an excavation is one person's word against another's. With one, the before and after photos and measurements answer the question quickly, which saves the neighbour, the builder and their insurers a long argument.

Ours are prepared by a structural engineer licensed in Tasmania (Engineer – Civil). An engineer measures each crack, notes its pattern and can later judge whether new damage is consistent with the works next door.

Gloved hand holding a crack-width gauge against a stepped crack through sandstone blocks
Figure 1Each crack is measured with a gauge, photographed and given a reference, so the same crack can be measured again after the work.

Key takeaways

  • Book it before the work starts. A record made afterwards can't prove what was there.
  • Measured cracks beat photos alone: width and length can be compared later.
  • One shared record protects the neighbour and the builder alike.

When you need one

When do you need a dilapidation report in Hobart?

You need a dilapidation report whenever building work next door could move the ground, shake the structure or undermine a footing. These are the usual triggers.

Neighbour excavation

A basement, pool, cut into a slope or new retaining wall near your boundary, especially on a sloping block.

Demolition next door

Removing a building that shares a wall with yours or stands close to it.

Vibration

Rock breaking, piling, compaction and heavy machinery close to older masonry.

Civil works nearby

New roads, stormwater mains or services dug along your frontage.

Before your own build

Builders and owners record neighbouring houses so they aren't blamed for old cracks.

Shared and close walls

Terraces, semi-detached homes and boundary walls, where work on one side reaches the other.

Is your house within the zone of influence?

An excavation affects the ground beside it. A common rule of thumb draws a line up from the base of the dig at about 45°; footings above that line, flatter in soft or wet ground, are more likely to move if the excavation isn't properly supported. If your footing sits inside it, a dilapidation report is the minimum, and the excavation may need engineered support.

Protection work in Tasmania

Underpinning or shoring a neighbour's property is protection work, and it needs a building surveyor. We can design and certify the underpinning or the support for an excavation; a licensed builder carries it out.

Is the neighbour's footing within the zone of influence?

Zone of influence of an excavation next to a neighbouring house Cross-section: a house on the left with a footing close to the boundary, and an excavation of depth H on the right supported by a shoring wall. A line drawn up from the base of the excavation at 45 degrees reaches the ground surface on the neighbour's side, and the neighbour's footing sits inside the shaded zone of influence. Neighbour's house Boundary Your site Excavation H Zone of influence 45° Shoring wall Neighbour's footing
Figure 2A simplified section. A common rule of thumb draws a line up from the base of an excavation at about 45°, flatter in soft or wet ground. Footings above that line, like the neighbour's here, are within the zone of influence and more likely to move if the excavation isn't properly supported. An engineer assesses the actual zone for each site.Illustrative diagram, not to a specific site. Prepared by Hobart Structural Engineers.

The report

What's in an engineer's dilapidation report?

An engineer's dilapidation report contains a photo log and a crack register that someone else could follow and measure again. Below is an extract with illustrative data, showing how the register is set out.

Dilapidation report · Crack register extractExample only · illustrative data, not a real property
Example
PropertyExample house, Suburb
ReasonExcavation on the next lot
ConstructionBrick on strip footings
AccessInside, outside, subfloor
RefLocationElementObservationWidthLengthPhoto
D-01East wall, outsideBrickworkStepped crack through mortar1.0 mm750 mmP-014
D-02Kitchen, east wallPlasterFine crack from window corner<0.1 mm300 mmP-022
D-03DrivewayConcreteShrinkage crack, no step0.5 mm2.1 mP-031
D-04Boundary wallSandstoneOpen mortar joint6 mm600 mmP-040

Illustrative example only, not a real property or result. Every report also sets out the scope and limits, and is signed by the engineer.

What every report includes

  • The date, weather, scope and any areas that couldn't be accessed
  • A photo log keyed to a simple plan of the building
  • A crack register with location, pattern, width and length
  • Doors, windows and floors that bind, gap or slope, where relevant
  • Outside areas: paving, driveways, fences and retaining walls
  • Monitoring points or tell-tales where the work is close
  • The engineer's signature and licence details

Who pays for a dilapidation report?

Usually the owner or builder doing the work pays, because the report protects them against claims for damage that was already there. A neighbour can also commission their own, and some contracts or approval conditions say who pays. Either way, the record is the same: we measure what is there.

Do you need access to the neighbour's house?

Yes, with the owner's permission, because many cracks only show inside. If access is refused, we record what we can from your side and from public land, and the report says what couldn't be inspected.

How it works

How do before-and-after dilapidation reports work?

A before-and-after report measures the same points twice: once before the work starts and once when it ends. The comparison shows what has changed.

  1. Within 1–2 business hours

    Fixed quote

    The fee, the inspection date and the report date, before we start.

  2. Before the work starts

    Baseline inspection

    Photos, measured cracks and monitoring points, inside and out.

  3. During the work, if quoted

    Monitoring visits

    Readings at set stages, such as bulk excavation or rock breaking.

  4. When the work ends

    After-works comparison

    The same points measured again, with any new or wider cracks listed.

Fixed fee, agreed first

Dilapidation report

$650+ GST · STARTING FROM

A signed condition report on a typical house. Larger buildings, several neighbouring properties, monitoring and the after-works comparison are set out in your fixed quote.

A quick record by the site team

  • Photos without measurements
  • Easy to dispute as one-sided
  • No view on what a crack means

An independent engineer

  • Measured, dated and repeatable
  • The same record for both sides
  • Can judge whether new damage fits the works

Choosing a report

Dilapidation report, structural inspection or defect report?

A dilapidation report records condition; it doesn't diagnose. If you need to know why something is cracking, or whether building work was done properly, a different report fits.

CompareDilapidation reportStructural inspectionBuilding defect report
The questionWhat condition is the building in before nearby work?What's moving, and does it matter?Was the building work done properly?
TimingBefore the work, then after itWhenever something changesAfter new or recent building work
OutputPhoto log and measured crack registerLikely cause, severity and recommendationsDefects, causes and a rectification scope
From$650 + GST$590 + GSTFixed quote

More on structural inspections and building defect reports. Not sure which fits? Choose "Not sure, please advise" on the quote form.

Where we prepare dilapidation reports

We prepare dilapidation reports across Greater Hobart, from older streets in Battery Point and New Town to hillside blocks in Sandy Bay and Kingston. See all areas we cover.

Related reading

FAQ

Dilapidation report FAQs

Still unsure? Call 03 6146 4747 or send photos for a fixed quote.

What is a dilapidation report?
A dilapidation report is a dated record of a building's condition before nearby work starts: photos, measured cracks and existing defects, signed by the engineer. It is also called a pre-construction condition report.
How much does a dilapidation report cost in Hobart?
Our dilapidation reports start from $650 + GST for a typical house. Larger buildings, several properties or monitoring during the works are priced in your fixed quote, sent within 1–2 business hours.
Who pays for a dilapidation report?
Usually the owner or builder doing the work, because the report protects them against claims for damage that was already there. A neighbour can also commission their own report, and some contracts or approval conditions say who pays.
Do I need a dilapidation report before my neighbour excavates?
It's wise whenever your footings, walls or paving are close enough to be affected, especially within the zone of influence of the excavation. Without a record, it's hard to show which cracks are new.
What is protection work in Tasmania?
Protection work is underpinning or shoring a neighbour's property so it isn't damaged by work next door. In Tasmania it needs a building surveyor. A dilapidation report beforehand gives everyone the same starting record.
Do you need access inside the neighbour's house?
Yes, with the owner's permission, because many cracks only show inside. If access is refused, we record what we can from your side and from public land, and the report states what couldn't be inspected.
Can the report be used if damage happens?
Yes. The after-works inspection repeats the same photos and measurements, so new or wider cracks are clear. If damage is found, a crack and foundation report can assess the cause. We are engineers, not lawyers, so get legal advice on any claim.
Is your report independent of the builder?
Yes. We record what is there in the same way whoever engages us, and we never sell or carry out repairs, so we gain nothing from the outcome.

Work starting next door?

Book the report before the first excavator arrives.

Tell us the address and the start date. You'll have a fixed quote within 1–2 business hours, with the inspection date and when you'll receive the report.

Mon–Fri 8:00am–5:00pm · Prices from $350 + GST · Engineering only, independent advice

Call Get a fixed quote