Homeowners · Builders · Renovators

Load-bearing wall removal and beam design in Hobart

Opening up a kitchen or living area means taking the load a wall carries and putting it somewhere else. We work out what the wall supports, size the steel or LVL beam, posts and footings, and give your builder drawings to build from.

From $550+ GST, fixed before we start
1–2 hrsto a fixed quote
Form 35for your building surveyor
New red steel beam across a widened opening in an older house, held on adjustable props during works, with a kitchen and a fireplace beyond

Engineering only

We size the beam, posts and footings. Any licensed builder can do the work.

Fixed quote in 1–2 business hours

Get a fixed quote for your beam design

Send photos of the wall from both sides, the room size and a photo of the roof space above it.

From $550 + GST. No obligation. Or call 03 6146 4747

Photos or plans optional · up to 5 files · Max 50 MB each

Licensed in TasmaniaEngineer – Civil · [licence no.]
Signed by a structural engineer[CPEng / NER]
From $550 + GSTPrice fixed before we start
IndependentWe never sell or carry out repairs

In short

Removing a load-bearing wall usually needs a structural engineer to size the replacement beam and check the posts and footings that carry its load to the ground. Our beam designs in Hobart start from $550 + GST, with drawings and a Form 35. Photos, room measurements and a look at the roof and ceiling framing are usually enough for a fixed quote within 1–2 business hours.

Fee
From $550 + GST, fixed before we start
We need
Photos, the opening width and the roof and ceiling framing
You receive
Beam, post and footing design, drawings and a Form 35

Before you start

How can you tell if a wall is load bearing?

You can tell a wall is load bearing by what sits on it and what sits under it, which means looking in the roof space and the subfloor, not just at the room. A wall is load bearing when it carries roof, ceiling or floor loads down to a footing.

  • It runs across the ceiling joists, often near their middle or where they join
  • Roof struts or a strutting beam bear on it in the roof space
  • A line of stumps, bearers or a footing sits directly beneath it
  • Another wall stands on it in a two-storey house
  • It used to be an outside wall before an extension was added
  • It is solid brick or stone, as internal walls often are in older Hobart houses

A wall that carries no roof load may still matter. In timber-framed houses, some internal walls are bracing walls that stiffen the house against wind. Removing one without replacing that bracing elsewhere weakens the house, so it needs checking too.

Key takeaways

  • The roof space and subfloor show whether a wall is load bearing. The room alone doesn't.
  • The beam is only half the job: posts and footings carry its load to the ground.
  • Some walls carry no roof but still brace the house against wind.
  • Your building surveyor confirms the approval category and asks for a Form 35.

Quick photos that help

Lift the manhole, take a torch, and photograph the roof framing above the wall. Add a photo of each side of the wall, and of the subfloor or slab edge below it if you can.

What we need

What does an engineer need to design the beam?

An engineer needs to know the opening you want, what the wall carries and what the beam's ends will stand on. Photos and measurements cover most of it, and the quote says if a visit is needed.

Photos of the wall

Both sides of the wall, the ceiling along it, and any cornices or cracks nearby.

Measurements

Room sizes, ceiling height, wall thickness and the width of the opening you want.

Roof and ceiling framing

Which way the joists run, any struts landing on the wall, and whether the roof is tiled or sheet metal.

What's above

A second storey, a hot water cylinder or tank, or solar panels on the roof over the wall.

What's below

A concrete slab, or a timber floor on stumps, with photos of the subfloor where the posts will land.

Plans, if you have them

Original or renovation plans and any earlier engineering help, but they aren't essential.

Beam options

Steel beam or LVL beam: which is better?

Neither is better everywhere: steel carries more load in a shallower depth, while LVL is lighter and fixes like timber. The span, the load and the space you have decide it.

CompareSteel beamLVL beam
Best forLong spans, heavy loads, second storeys and masonry wallsShorter spans and moderate roof or ceiling loads
DepthShallower for the same load, so easier to hide in the ceilingDeeper for the same load
HandlingHeavy; usually needs lifting gear and is cut to length off siteLighter; carried in and cut on site like timber
FixingBolted connections, timber packers and plates to the framingNailed, screwed or bolted like other timber
Watch forCorrosion protection where it's exposed or near damp masonryMust stay dry; not for exposed or damp positions

General engineering practice. Your design names the exact member, size and connections.

Posts and footings: where does the load go?

Each end of a new beam puts a concentrated load on a post or wall, and that load has to reach the ground. A load that was spread along the wall now arrives at two points, which the floor or slab below was never designed to carry.

On a concrete slab, a post usually needs a new pad footing cut into the slab. In a house with a timber floor, it needs new stumps or piers under the posts, sized for the load and the ground. On reactive clay, the footing must suit the site class.

Your builder props the ceiling and roof while the wall comes out. Our drawings show the beam, posts, footings and connections, and note the propping where the sequence matters.

Subfloor of a raised timber house with old timber stumps on stone pads under heavy bearers, a torch beam and a yellow tape measure on red soil
Figure 1In a raised timber house, the posts under a new beam need their own footings. Old stumps like these are rarely sized for the point load a beam delivers.

Approvals

Do you need approval to remove a load-bearing wall in Tasmania?

Often you do, but your building surveyor confirms the category for your job. Tasmanian building work is sorted into low risk, notifiable and permit work by the Director's Determination, and where a wall removal falls depends on the building and what else is changing.

If the work needs a building surveyor, they assess it and issue a Certificate of Likely Compliance. Our design goes with that application, with a Form 35 (Certificate of the Responsible Designer).

Two things change the picture. Places on the Tasmanian Heritage Register need Heritage Council approval as well (see heritage and older homes). And if a wall has already come out without an engineer, we can assess what was built and design any fix, and certify it where it complies (see Form 35 and Form 55 certificates).

Not sure where your project sits? Our guide to building approvals in Tasmania explains the categories.

Fixed fee, agreed first

Wall removal and beam design

$550+ GST · STARTING FROM

For a typical single wall in a single-storey house. Your fixed quote reflects the number of walls, the loads above and whether a site visit is needed.

  • Steel or LVL beam sized and specified
  • Posts, footings and connections designed
  • Drawings your builder can price and build from
  • A Form 35 for your building surveyor
Get a fixed quoteSee all prices

How it works

How does a wall removal design work?

Three steps from your photos to drawings your builder and surveyor can use.

  1. Send photos and measurements

    The wall from both sides, the roof space above and the room sizes, using the form on this page.

  2. Get a fixed quote

    Within 1–2 business hours, saying what's included, whether a visit is needed and the delivery date.

  3. Receive the design

    Beam, posts, footings and connections on drawings, with calculations and a Form 35.

Planning a bigger change? Wall removals often come with an extension or renovation, and we can design both together.

FAQ

Wall removal and beam design FAQs

Still unsure? Call 03 6146 4747 or send photos for a fixed quote.

Do I need a structural engineer to remove a load-bearing wall?
In most cases, yes. Someone has to size the beam that replaces the wall and check the posts and footings that carry its load down to the ground. Where a building surveyor is involved, they will ask for the design and a Form 35 from whoever prepared it.
How much does a structural engineer cost to remove a load-bearing wall in Hobart?
Our beam designs start from $550 + GST. Several walls, a two-storey house, masonry walls or a site visit can add to that, and your fixed quote within 1–2 business hours says exactly what's included. The builder prices the building work separately.
How do I know if a wall is load bearing?
Check the roof space and subfloor: a wall that sits under ceiling joists, roof struts or another wall, or above a line of stumps or a footing, is probably load bearing. Only the framing confirms it, so send photos and we'll tell you.
Can you design the beam from photos?
Often, yes. Photos of the wall, the ceiling and the roof space, with the room measurements, are usually enough. Your quote says if a site visit is needed, for example to open up a ceiling or check a footing.
Is a steel beam or an LVL beam better?
It depends on the span, the depth you can fit and access. LVL is lighter and fixes like timber; steel carries more load in a shallower depth. We specify whichever suits your opening.
Do I need approval to remove a wall in Tasmania?
It depends on the work and the building, so your building surveyor confirms whether it is low risk, notifiable or permit work. Heritage-listed places also need Heritage Council approval.
Can the new beam be hidden in the ceiling?
Often, yes. A flush beam sits within the ceiling depth with the joists hung off its side, so there's no bulkhead. Whether it fits depends on the span, the load and the depth of the existing framing.
Does removing a non-load-bearing wall need an engineer?
Usually not for the wall itself, but some internal walls brace the house against wind even though they carry no roof load. Check before you remove one: we can confirm from photos.

Ready when you are

Send a few photos. We'll send a fixed price.

Photos or plans are enough to quote. You'll have a fixed quote within 1–2 business hours, with whether the job needs a site visit and when you'll receive it.

Mon–Fri 8:00am–5:00pm · Prices from $350 + GST · Engineering only, independent advice

Call Get a fixed quote