How it works

From photos to a signed report

Four steps, with the price and the delivery date fixed before anything starts. Most jobs can be quoted from photos or plans, and your quote tells you whether we need to visit.

Footing drawings, a signed certificate, a scale ruler and a pen on a desk

In short

Working with Hobart Structural Engineers takes four steps. Send photos or plans through the quote form, get a fixed quote within 1–2 business hours (Mon–Fri 8:00am–5:00pm), have a site visit if the quote says the job needs one, then receive a signed report, design or certificate by the date in your quote. Site visits cover Greater Hobart; desktop work covers all of Tasmania.

To quote
Photos or plans are usually enough
Your quote
Fixed, within 1–2 business hours
You receive
A signed report, design or certificate

The process

What are the steps?

There are four steps from your first message to a signed document, and the second one fixes the price and the delivery date before any work starts.

  1. Step 1 · Any time

    Send photos or plans

    Use the quote form: your name, phone, email, the suburb of the property, the service and a short description. Attach up to 5 photos, plans or earlier reports, 50 MB each. Mention any deadline, such as settlement, a permit or a builder's start date.

  2. Step 2 · Within 1–2 business hours

    Get a fixed quote

    We read your request and reply with a fixed fee (ex GST), what's included, whether the job needs a site visit and the date you'll receive the report or design. There's no obligation to go ahead.

  3. Step 3 · If the job needs it

    Site visit

    For structural inspections, crack reports and dilapidation reports, the engineer visits the property. Many designs, certificates and quote reviews are done from documents and photos. Outside Greater Hobart, we work from photos and plans.

  4. Step 4 · By the date in your quote

    Signed report, design or certificate

    A report, drawings and calculations, or a certificate signed by a licensed engineer, with a Form 35 for our designs or a Form 55 for an assessable item where the work needs one. Questions about it? Call or email and we'll talk it through.

Torch beam lighting old timber stumps under the bearers of a raised house, with a yellow tape measure on red soil
On a site visit the engineer looks where the problem starts. Under a raised timber house, that often means the stumps, bearers and the ground they sit on.

Desktop jobs, Tasmania-wide

An underpinning quote second opinion is done from the contractor's quote, any reports and your photos, with no visit, from $390 + GST. Designs and certificates from plans are available anywhere in Tasmania.

Before you send

What should I send for my job?

Send what lets an engineer see the problem or the project: photos, plans, measurements and any reports you already have. This table shows what helps for each kind of job.

JobSend thisHelps if you have it
Cracks, sloping floors, movementPhotos of each crack close up, with a coin or ruler for scale, and from further back. When you first noticed themDoors or windows that stick, earlier reports, recent plumbing leaks
Pre-purchase inspectionThe address, what worries you, and the building inspector's report if you have oneYour settlement or cooling-off date
Underpinning second opinionThe contractor's quote and scope, plus photos of the cracksAny engineer's or soil report the quote relies on
Wall removalPhotos of the wall from both sides and a floor plan with the wall markedPhotos of the roof space above it, and the roof type
Retaining wallPhotos of the slope, the wall height and length you need, and the distance to the boundary and buildingsWhat sits above the wall (driveway, house, pool), any site classification report
Deck, pergola or carportA sketch or plan with sizes, height above the ground, roofed or not, attached or freestandingPhotos of where it attaches to the house
Swimming poolA site plan with the pool position, the pool size and type (concrete or fibreglass), photos of the slopeDistance to the house, the boundaries and any council stormwater pipe
Stormwater and drainageA site plan with roof and paved areas, and any council conditionsThe council's stormwater map or connection point
Extension or renovationArchitectural or building design drawingsA site classification report and any existing structural drawings
Form 55 or as-built certificateWhat was built and when, the approved plans and the building surveyor's requestConstruction photos taken before the work was covered up
Landslip or footingsThe address and plans of what you want to buildThe Landslip Hazard Code band from LISTmap, if you've checked it
Commercial projectArchitectural drawings and the building surveyor's requirementsExisting structural drawings, plant, racking or solar loads

Not sure what to send? Photos and a short description are enough to start. We'll ask if we need anything else.

Your files

What happens with the files I send?

Your files are used only to quote and carry out your job. They are not sold or used for marketing.

  • Uploaded through our form processor. Files you attach in the quote form go through Web3Forms, which sends us your request with links to the files.
  • Used for your quote and your job. We use them to price the work and, if you go ahead, to prepare your report or design.
  • Shared only as your job needs. For example with your building surveyor, builder or designer, or where the law requires it.
  • Kept as professional records. Reports, drawings and photos may be needed later, for example to compare a crack over time.

More detail is in our privacy policy.

Large or many files

More than 5 files, or over 50 MB?

Attach the most useful ones to the form, then email the rest, or a download link, to info@hobartstructuralengineers.com.au with your name and suburb so we can match them to your request.

Timing

How long does it take?

Your fixed quote arrives within 1–2 business hours, and the quote sets the delivery date for your report or design. Every job is different, so the delivery date is in your quote, not on this website.

StageWhen
Your fixed quoteWithin 1–2 business hours, Mon–Fri 8:00am–5:00pm. Requests sent after hours are quoted within the first 1–2 business hours of the next business day.
Site visitIf the job needs one, the visit is arranged with you and confirmed in your quote.
Report, design or certificateBy the delivery date in your quote. It depends on the scope, any site visit and the information available.
Your deadlineTell us the date (settlement, cooling-off, permit or builder's start). Your quote confirms whether we can meet it.

Fees

How does payment work?

Payment terms are in your quote. All our prices are in Australian dollars and exclude GST.

The fee is fixed for the scope in the quote. If you later want something outside it, such as a second structure or a change to a finished design, we quote that separately before we start it.

Starting prices run from $350 + GST for a Form 55 certificate to $850 + GST for swimming pool engineering, and some services, such as underpinning design, restumping, landslip reports and all commercial work, are priced by fixed quote per job.

See all prices

When your building surveyor is involved

Underpinning, major structural repairs, residential decks, retaining walls and swimming pools are notifiable work in Tasmania. A building surveyor issues a Certificate of Likely Compliance, and our Form 35 goes with the application. Read building approvals in Tasmania.

Not sure which service you need?

Choose "Not sure, please advise" on the quote form and describe what's happening. We'll tell you what the job needs.

FAQ

How it works: FAQs

Still unsure? Call 03 6146 4747 or send photos for a fixed quote.

Can you quote from photos alone?
Yes. Photos or plans are enough for a fixed quote on most jobs. If we need one more photo or measurement to price it, we ask before we quote.
What if I send my request in the evening or on a weekend?
Quotes are prepared Monday to Friday, 8:00am to 5:00pm. A request sent outside those hours is quoted within the first 1–2 business hours of the next business day.
Do you always need to visit the site?
No. Your quote says whether the job needs a site visit. Inspections, crack reports and dilapidation reports do, while an underpinning quote second opinion (from $390 + GST) and many designs and certificates are done from documents and photos.
Can you meet my settlement or permit deadline?
Tell us the date when you send your request. Your quote states the delivery date, so you know whether it works before you book.
How do I pay?
Payment terms are in your quote. All our prices are in Australian dollars and exclude GST.
What if I have more than five files?
The form takes up to 5 files of 50 MB each. Attach the most useful ones and email the rest, or a download link, to the address on our contact page.

Ready when you are

Send a few photos. We'll send a fixed price.

Photos or plans are enough to quote. You'll have a fixed quote within 1–2 business hours, with whether the job needs a site visit and when you'll receive it.

Mon–Fri 8:00am–5:00pm · Prices from $350 + GST · Engineering only, independent advice

Call Get a fixed quote