Guides

Structural engineering guides for Tasmania

Plain answers on Tasmanian approvals, cracks, repair costs, retaining walls, landslip and building projects, from engineers who never sell repairs.

Hillside suburbs above the Derwent River with kunanyi / Mount Wellington behind

In short

Our structural engineering guides answer the questions Tasmanian owners ask before calling an engineer: whether work is low risk, notifiable or permit work, when a crack matters, what underpinning and restumping cost in Hobart, and when a retaining wall needs an engineer. Each cites official Tasmanian sources, gives the key numbers and ends with when to call an engineer.

Guides
12, in five topics
Sources
Official Tasmanian rules, linked in every guide
Independent
We never sell or carry out repairs

Find your answer

Which guide answers my question?

Find your question, read the guide, then see the service that deals with it.

Your questionReadRelated service
Do I need an engineer or a building surveyor?Engineer or building surveyorForm 35 & Form 55 certificates
Is my job low risk, notifiable or permit work?Building approvals in TasmaniaExtensions & renovations
Inspector or engineer before I buy?Inspector vs engineerPre-purchase structural inspection
Is this crack serious?Cracks in wallsCracks & foundation report
What is my site class?Hobart soils and site classesSite classification & footings
What does underpinning cost?Underpinning cost in HobartUnderpinning advice & design
What does restumping cost?Restumping cost in HobartRestumping engineering
Does my retaining wall need a permit?Retaining wall rulesRetaining wall design
Is my block in a landslip area?Landslip areas in HobartLandslip reports
Can I put a pool on a slope?Pool on a sloping blockSwimming pool engineering
What does a granny flat need?Granny flat engineeringExtensions & renovations
Can I build over a stormwater easement?Stormwater easementsStormwater & drainage

Where the facts come from

Where do the facts in these guides come from?

From official Tasmanian rules and published reports first. Every guide ends with its own list of sources. These are the ones we use most.

Next step

When should you call a structural engineer instead of reading on?

When the question is about your building rather than the rules. A guide can tell you what a 5 mm crack means; only an inspection tells you why yours appeared.

  • Cracks are 5 mm or wider, still growing, or come with sticking doors and sloping floors
  • Your building surveyor has asked for an engineer's design, a Form 35 or a Form 55
  • You hold a repair quote, such as underpinning, and want an independent view
  • You're planning a retaining wall, an extension, a pool or a wall removal

Need an engineer?

Send photos or plans for a fixed quote

A licensed structural engineer replies within 1–2 business hours (Mon–Fri 8:00am–5:00pm) with a fixed price and whether the job needs a site visit.

FAQ

About these guides

Still unsure? Call 03 6146 4747 or send photos for a fixed quote.

Are these guides specific to Tasmania?
Yes. They follow Tasmania's Building Act 2016, the Director's Determination on categories of building work and Greater Hobart council rules, and each guide lists its sources. Rules in other states differ.
Who writes the guides?
Hobart Structural Engineers, a licensed structural and civil engineering practice. We inspect, diagnose, design and certify, and we never sell or carry out repairs, so the guides have nothing to sell you.
Are the cost figures in the guides your prices?
No. The underpinning and restumping ranges are other businesses' published figures, each named with the date it was checked. Our own fees start from $350 + GST and are listed on the prices page.
Can a guide replace advice for my house?
No. The guides explain the rules and the usual causes. Your building surveyor confirms the approval category, and an engineer confirms what your building needs.
Which guide should I start with?
Not sure who you need? Start with structural engineer or building surveyor. Seeing cracks? Start with cracks in walls. Planning work? Start with low risk, notifiable or permit work.
Do the rules in the guides change?
They can. Each guide shows the date it was last updated. One change ahead: Tasmania applies NCC 2022 until 30 April 2027 and NCC 2025 from 1 May 2027.

Ready when you are

Send a few photos. We'll send a fixed price.

Photos or plans are enough to quote. You'll have a fixed quote within 1–2 business hours, with whether the job needs a site visit and when you'll receive it.

Mon–Fri 8:00am–5:00pm · Prices from $350 + GST · Engineering only, independent advice

Call Get a fixed quote