Approvals

Low risk, notifiable or permit work: when is engineering needed?

Tasmania sorts building work into four categories. Which category common jobs fall into, what changes in a hazard area or near an easement, and when the work needs an engineer's design.

Weatherboard cottage with a new timber-framed second storey under construction, scaffolding around it and kunanyi / Mount Wellington behind

In short

Tasmania sorts building work into four categories under the Director's Determination. Categories 1 and 2 are low risk and need no building surveyor. Category 3 is notifiable work, approved by a building surveyor's Certificate of Likely Compliance. Category 4 also needs a council building permit. Engineering comes in when the structure is designed or repaired: underpinning, raised decks, retaining walls over the low-risk limits and extensions.

Key takeaways

  • Four categories: low risk (1 and 2), notifiable (3) and permit (4). Work not listed in Categories 1 to 3 is permit work.
  • Low-risk work in a bushfire, landslip, flood or coastal hazard area becomes notifiable. Some house work in High hazard bands becomes permit work.
  • Some rules require an engineer's design outright, such as retaining walls up to 1.8 m. Notifiable structural work needs design documents the building surveyor can assess.
  • Glenorchy City Council's building permits lapse if work hasn't started within 12 months, and work must be finished within 24 months.

The first approval question in Tasmania is which category the work falls into. The answer decides who may do the work, whether a building surveyor is involved and whether council issues a permit. The categories come from the Director's Determination: Categories of Building and Demolition Work, made under the Building Act 2016. Version 1.4 has applied since 12 April 2021. Your building surveyor will confirm whether a newer version applies to your job.

Building approvals in Tasmania: quick facts

Low risk
Categories 1 and 2: no building surveyor, Form 80 for some items
Notifiable
Category 3: building surveyor's Certificate of Likely Compliance
Permit
Category 4: Certificate of Likely Compliance plus a council permit
Hazard areas
Low-risk work there becomes notifiable
Engineer designed
Required for retaining walls up to 1.8 m (Category 2)
Work of $20,000 or more
Training levy and Building Administration Fee apply

What are the four categories of building work in Tasmania?

The four categories are Category 1 and Category 2 low-risk work, Category 3 notifiable work and Category 4 permit work, and the checks rise with the risk. Anything not listed in Categories 1 to 3 is permit work by default.

CategoryWho can do the workApproval before work startsPaperwork
1. Low riskAn owner, a competent person or a licensed builderNone, within the size limits and Standard LimitationsForm 80 to council for some items
2. Low riskA licensed builder (a competent person only where the clause allows)None, within the limitsForm 80 for some items
3. NotifiableA licensed builderBuilding surveyor's Certificate of Likely Compliance, given to councilForm 35 from each designer, Notice of Work, inspections
4. PermitA licensed builder, or an owner with an owner builder permitCertificate of Likely Compliance, then a council building permitAs for notifiable work, plus the permit

Source: Director's Determination v1.4. An owner doing work that isn't owner low-risk work needs an owner builder permit and a separate council building permit.

Planning is a separate question. The Determination says there is no connection between planning approval and the building category, so a job can need a planning permit and not a building permit, or the other way round.

Which category do common home projects fall into?

Most small outdoor structures are low risk within set sizes, while structural repairs, underpinning, raised decks, larger retaining walls and pools are notifiable. The table lists only items the Determination spells out.

WorkLow risk whenOtherwise
DeckNon-roofed, floor less than 1 m above the ground beneath (1.3.5)Notifiable (3.1.2)
Pergola, garden arch, trellisUp to 36 m² and 3.5 m high, uncovered or permeable roof, no masonry or concrete (1.3.9)Next category up
Gazebo, summer house, BBQ shelterUp to 18 m² and 3.5 m high, single storey, no masonry or concrete (1.3.10)Next category up
Verandah or porchUp to 18 m², floor less than 1 m above the ground, licensed builder, Form 80 (2.1.2)Notifiable
Shed, garage or carportUp to 18 m² built on site (1.3.1); up to 36 m² as an engineer-designed kit, Form 80 (1.3.2); up to 36 m² and 9 m span by a licensed builder (2.3.1)Notifiable (3.1.1)
Fence or freestanding wallMasonry or concrete up to 1.2 m, other fences up to 2.1 m, chain link up to 3 m (1.3.6 to 1.3.8)Notifiable (3.1.4)
Retaining wallUp to 0.5 m retained within 1.5 m of a boundary, road or right of way, otherwise 1.2 m (1.3.14); up to 1.8 m if engineer designed and built by a licensed builder (2.3.2)Notifiable (3.1.3)
Internal non-load-bearing wallLicensed builder, if no fire-rated wall is affected (2.1.1)Notifiable alteration (3.0.1)
Load-bearing wall or other structural alterationOnly if a building surveyor assesses it as minor (2.8.1)Notifiable alteration (3.0.1)
RepairsLike-for-like, non-structural (1.0.1); other repairs that don't affect structural soundness, but not replacing piers or stumps (2.0.1)Major structural repairs are notifiable (3.0.3)
Underpinning a houseNever low riskNotifiable (3.0.4)
Swimming pool or spa, and barrierOnly a relocatable pool up to 9 m², once a barrier is in place (1.3.11)Notifiable (3.1.8)
New house, addition or alterationNever low riskNotifiable up to two storeys (3.0.1); permit work in the cases below

Clause numbers from the Director's Determination v1.4. Every low-risk item must also meet the Standard Limitations (cut and fill, hazard areas, easements, fire separation). Confirm the category with your building surveyor.

How do hazard areas and easements change the category?

Work in a bushfire, landslip, coastal inundation, coastal erosion or flood-prone hazard area moves from low risk to notifiable, and a new house, addition or alteration becomes permit work in a High landslip band, a High coastal erosion or inundation band, or at BAL-40 or Flame Zone. Check your property on ListMap, as West Tamar Council advises, or ask your building surveyor.

The Standard Limitations also take work out of low risk when it:

  • cuts or fills more than 500 mm within 1.5 m of a boundary, or more than 1.2 m elsewhere (1.8 m for a licensed builder)
  • sits over an existing drain or within 1 m of its edge, without the council general manager's written consent
  • sits in a service easement without the consent of the person it benefits, or within 2 m of TasWater infrastructure
  • is a shed or garage that doesn't meet the fire separation distances to the boundary or the house

Small work, big site constraint

West Tamar Council's example: a 1 m high retaining wall isn't low-risk work if it sits in an easement, and the same applies in a landslip hazard band. Hobart's documented landslide areas include Rosetta, in Glenorchy, and Taroona. Read building in a landslip area and building over a stormwater easement.

We don't prepare bushfire attack level assessments: a bushfire hazard practitioner prepares that. We do prepare landslip reports and the structural design that follows.

When does Tasmanian building work need an engineer?

Some low-risk work must be engineer designed by rule, and notifiable or permit work needs design documents the building surveyor can assess, which for structural work is usually an engineer's design. Under the Building Act 2016, designers must provide documents good enough to assess the work and for a licensed builder to build it.

  1. Is the job on the low-risk list, within its size limits?

    Check the table above and the Standard Limitations.

    Yes: go to the next questionNo: notifiable or permit work, so a building surveyor is needed and the structure needs a designer
  2. Is the site in a hazard band, an easement or within 1 m of a drain?

    Landslip, bushfire, flood and coastal bands all count.

    Yes: notifiable or permit workNo: go to the next question
  3. Does the clause say "engineer designed", or does the work touch load-bearing parts?

    Retaining walls up to 1.8 m, beams, footings, stumps and bracing are the usual ones.

    Yes: an engineer's designNo: low-risk work, with a Form 80 if the clause requires it

Underpinning is the clearest notifiable example: the Determination notes that it may need a site and soil test to AS 2870 and an engineer's design before work starts. The same thinking applies to underpinning, load-bearing wall removal, raised decks, pools, retaining walls and extensions.

Footing drawings, a signed certificate, a scale ruler and a pen on a desk
Figure 1For notifiable work, each designer signs a Form 35 and the building surveyor assesses the drawings before issuing a Certificate of Likely Compliance.

Which forms, fees and certificates will you see?

For notifiable or permit work you will usually see a Form 35 from each designer, a Notice of Work from the builder, the building surveyor's Certificate of Likely Compliance and, at the end, a certificate of completion.

Form 35
Certificate of the Responsible Designer, required with each application for a Certificate of Likely Compliance.
Form 55
Certificate of Qualified Person – Assessable Item, for items such as a geotechnical report or an as-built structural check.
Form 80
Notification of Low Risk Work, lodged with council where a low-risk clause says council must be told.
Levy and Building Administration Fee
Building work of $20,000 or more attracts the Building and Construction Industry Training Levy and a Building Administration Fee, in any category.

We provide Form 35 and Form 55 certificates, with Form 55 from $350 + GST.

How long does a building permit last in Tasmania?

Glenorchy City Council says a building permit lapses if work hasn't started within 12 months of issue, and all work must be completed within 24 months; an extension can be sought before the 24 months run out. The Building Act 2016 makes the owner responsible for finishing the work before the permit expires or for having it extended. Read the conditions on your own permit, because each one carries its own.

When to call a structural engineer

Call an engineer as soon as you know the job touches the structure, before the drawings go to the building surveyor. Changing a design after lodgement costs time.

  • A retaining wall above 0.5 m near a boundary or 1.2 m elsewhere
  • A load-bearing wall to remove, or a new opening in one
  • Underpinning, restumping or another structural repair
  • A landslip band or easement on your title or ListMap
  • Your building surveyor wants a Form 35, a Form 55 or calculations

Not sure where your job sits? Start with do I need a structural engineer or a building surveyor?

Sources

  1. Director of Building Control, Director's Determination: Categories of Building and Demolition Work, version 1.4. Applies from 12 April 2021. Category tables, Standard Limitations, General Requirements and Category 4 rules
  2. Building Act 2016 (Tas)
  3. Glenorchy City Council, Do I need a building permit?. Permit valid 12 months from issue; work completed within 24 months
  4. West Tamar Council, Building. Summary of Categories 1 to 4, ListMap hazard check and the easement example
  5. Building Standards Tasmania (formerly CBOS), Use of approved Form 35
  6. Tasmanian Planning Scheme, State Planning Provisions, C15.0 Landslip Hazard Code

FAQ

Building approvals in Tasmania: FAQs

Still unsure? Call 03 6146 4747 or send photos for a fixed quote.

What is notifiable building work in Tasmania?
Category 3 work that a licensed builder can do once a building surveyor has issued a Certificate of Likely Compliance and given it to council. Underpinning, major structural repairs, residential decks, larger retaining walls, pools and most house extensions are notifiable.
Do I need a building permit in Tasmania?
Only for Category 4 permit work, or for work an owner does that isn't owner low-risk work. Notifiable work needs a building surveyor's certificate but no council permit, and low-risk work needs neither.
What is low risk building work?
Category 1 and 2 work in the Director's Determination, such as a non-roofed deck less than 1 m high or a retaining wall up to 1.2 m away from boundaries. It must also meet the Standard Limitations, and some items need a Form 80 to council.
Does a hazard area change the category?
Yes. Low-risk work in a bushfire, landslip, flood or coastal hazard area becomes notifiable, and a new house, addition or alteration in a High landslip band, a High coastal band, or at BAL-40 or Flame Zone becomes permit work.
Does underpinning need a permit in Tasmania?
Underpinning a house is notifiable work, so it needs a building surveyor's Certificate of Likely Compliance before it starts. The Determination notes it may need an AS 2870 site and soil test and an engineer's design.
Is a planning permit the same as a building permit?
No. The Determination says there is no connection between planning approval and the building category, so a job can need one, both or neither. Check planning with council and building approval with a building surveyor.
How long is a building permit valid?
Glenorchy City Council says a permit lapses if work hasn't started within 12 months of issue, and work must be completed within 24 months unless an extension is granted. Check the conditions on your own permit.
Who decides which category my job is in?
Your building surveyor, using the Director's Determination. Councils give general advice too, and we can tell you whether the structural parts need an engineer's design.

Ready when you are

Send a few photos. We'll send a fixed price.

Photos or plans are enough to quote. You'll have a fixed quote within 1–2 business hours, with whether the job needs a site visit and when you'll receive it.

Mon–Fri 8:00am–5:00pm · Prices from $350 + GST · Engineering only, independent advice

Call Get a fixed quote